This page to give you a small insight into our paving services and how we can transform your required area from start to finish.
The site will be cleared of all debris and rubble on completion and the site will be made good. An inspection will be made 4-6 weeks after completion and any joints that have moved will be filled up again with dry sand, all work carried out to BS3921
1. Clear the ground Type 1 Hardcore to be used where required |
2. Mark out the edge Lay coarse sharp sand and level. Base compacted. |
3. Laying Starting from lowest level, lay bricks row by row. |
4. Edge Blocks We use a diamond tipped cutter for higher finish. |
5. Compacting Compact blocks to a 50mm depth with plate vibrato. |
6. Finishing Brush kiln dried sand into the joints then compac. |